63 New Bond Street London
Problem Surv-A appointed to design, monitor and quality audit the below ground structural waterproofing for a prestigious building that was Fenwick dept. Store. The building is a complex integration of...
Learn more
Problem Surv-A appointed to design, monitor and quality audit the below ground structural waterproofing for a prestigious building that was Fenwick dept. Store. The building is a complex integration of...
Learn more
Problem The basement was suffering from visible mould growth and dampness. Free water was also discovered entering via cracks in the structure. An intrusive and targeted investigation was carried out...
Learn more
Problem Severe and widespread ground water ingress affected the double basement areas, with significant cracking of the structure. The hydrostatic pressures on the original structure meant that over 70 ground...
Learn more
This is another project through one of our best clients, blackburn (project consultants) we carried out a condition survey of an existing building just off of Fleet Street. The building...
Learn more
This is a sensitive ongoing defect investigation. The house was extended significantly back in 2016 with the major change being below ground structures. The existing house was retained but an...
Learn more